Nieuwe trailers en interviews
Registreer je bij FilmBooster
- Vind zielsverwanten met dezelfde filmsmaak bij jou in de buurt.
- Help ons om onze wereldwijde filmdatabase aan te vullen.
- Laat je inspireren door de film- en seriebeoordelingen van je vrienden.
- Schrijf filmrecensies en verdien het respect van je lezers.
- Krijg meldingen als bepaalde films en series op tv, in de bioscoop of elders worden vertoond.
- Maak een overzicht van films en series die je nog wilt zien.
Meest bezochte films
Hit Man (2023) |
Bad Boys: Ride or Die (2024) |
Une affaire d'honneur (2023) |
Furiosa: A Mad Max Saga (2024) |
Sous la Seine (2024) |
The Fall Guy (2024) |
Atlas ptáků (2021) |
Civil War (2024) |
The Watchers (2024) |
Meest bezochte series
Star Wars: The Acolyte (2024) |
Star Wars: The Acolyte - Destiny (2024) |
The Boys (2019) |
The Tattooist of Auschwitz (2024) |
Star Wars: The Acolyte - Revenge / Justice (2024) |
Star Wars: The Acolyte - Lost / Found (2024) |
Dark Matter (2024) |
Becoming Karl Lagerfeld (2024) |
The Boys - Season 4 (2024) |
Nieuw in de bioscoop
Treasure (2024) |
vanaf 13.06.2024 13.06. |
Nice Ladies (2024) |
vanaf 13.06.2024 13.06. |
Salem (2023) |
vanaf 13.06.2024 13.06. |
Joan Baez I Am A Noise (2023) |
vanaf 13.06.2024 13.06. |
Boneyard (2024) |
vanaf 13.06.2024 13.06. |
The Watchers (2024) |
vanaf 13.06.2024 13.06. |
Black Tea (2024) |
vanaf 13.06.2024 13.06. |
Spoorloos (1988) |
vanaf 13.06.2024 13.06. |
De Mooiste Dag (2024) |
vanaf 13.06.2024 13.06. |
Nieuw bij streamingdiensten
Desde el mañana (2024) (serie) |
Disney+ |
Mysteries of the Terracotta Warriors (2024) |
Netflix |
Skazana - Season 4 (2024) (Seizoen) |
Max |
Hit Man (2023) |
Netflix |
Becoming Karl Lagerfeld (2024) (serie) |
Disney+ |
Hairaki (2024) (serie) |
Netflix |
Fantasmas (2024) (serie) |
Max |
Queenie (2024) (serie) |
Hulu |
Criminal Minds (2005) (serie) |
Paramount+ |
Nieuwe recensies van TOP-gebruikers
D.Moore–Sous la Seine(2024)
Skating in oil! A meta espionage action whirlwind with many incredible twists and turns. Matthew Vaughn takes the viewer for a ride on several levels and yet it's seamlessly coherent and everything makes perfect sense in the end, no matter how absurd the genre crutch. Sam Rockwell is terrific, and the train fight with…
(meer)Jeoffrey–Dekisokonai to jobareta moto eijú wa, džikka kara cuihósareta node suki katte ni ikiru koto ni šita(2024)
Honestly, this was probably the worst series I wasted my time on this anime season. The animation was weak, the music was forgettable, but those weren’t even the main issues. The biggest problem for me was the main character. His behavior and voice acting made him incredibly unlikable. Aoi Shouta's voice just doesn't…
(meer)EvilPhoEniX–Hit Man(2023)
Richard Linklater is quite an unexplored director for me, his work has always passed me by, so I didn't have high expectations and I wasn't too impressed either. The action was non-existent, the humour minimal to nonexistent and the whole thing hinged on the likable duo of Glen Powell and the beautiful Adria Arjona,…
(meer)Fans of Dumas' might not agree, but "The Three Musketeers" is at best "just" period-conditioned consumable reading, excessively naive and heavily romanticized. Directors attempting to adapt the book were aware of its limitations and the resulting risks for today's audience, often opting for exaggeration and comedic…
(meer)Nieuwe recensies van opkomende gebruikers
My third encounter with Jo Koy didn't go as well as I'd hoped. While it was certainly better than his Filipino special (which set the bar incredibly low), the show had its awkward moments, especially in the beginning. I often found myself not laughing as much as I'd expected. Thankfully, there were a few solid jokes…
(meer)EvilPhoEniX–México Bárbaro(2014)
I was looking forward to Barbarous Mexico since the first trailer, but unfortunately it looks like a horror movie from a shabby VHS. The plot is bland and the stories have no twists, everything looks horrible and amateurish, there’s hardly any gore, the entertainment is non-existent and the stories are not very…
(meer)EvilPhoEniX–Emelie(2015)
An interesting premise, but the pervasive PG13 feel makes Emelie a very light horror spectacle. It's a shame that they didn’t push the envelope at all, there’s not twist and the finale is not intense enough. The performances by the kids and the deranged babysitter pull it up to better than average.
(meer)I enjoyed the trailer, but the film is a bad joke. Those who were expecting a pumped up action brutal ride driven by a historical theme like me will be disappointed, instead you get a lot of romance, tarted-up actors and actresses, mediocre sets, naive behaviour of all involved, together with a a slower pace, minimum…
(meer)EvilPhoEniX–11.22.63(2016)
An unexpectedly entertaining and solid film. James Franco is amazing, the retro look is cool, the dialogue is good and the pace is very nice. It's got style and drive and that's what counts. Praise for the second part, which creates an almost horror-like atmosphere in the style of The Amityville Horror. (“If you…
(meer)Meest bezochte acteurs
Glen Powell (acteur / scenarioschrijver / producentacteur / scenarioschrijver, geb. 1988) |
Adria Arjona (actriceactrice, geb. 1992) |
Will Smith (acteur / producent / componistacteur / producent, geb. 1968) |
Ryan Gosling (acteur / producent / regisseuracteur / producent, geb. 1980) |
Dakota Johnson (actrice / producentactrice / producent, geb. 1989) |
Anya Taylor-Joy (actriceactrice, geb. 1996) |
Meest bezochte makers
Richard Linklater (regisseur / scenarioschrijver / producentregisseur / scenarioschrijver, geb. 1960) |
Olmo Omerzu (regisseur / scenarioschrijver / acteurregisseur / scenarioschrijver, geb. 1984) |
Xavier Gens (regisseur / scenarioschrijver / producentregisseur / scenarioschrijver, geb. 1975) |
Terry Gilliam (regisseur / scenarioschrijver / acteurregisseur / scenarioschrijver, geb. 1940) |
David Leitch (regisseur / producent / acteurregisseur / producent, geb. 1969) |
Eric Kripke (maker / scenarioschrijver / producentmaker / scenarioschrijver, geb. 1974) |
Vandaag jarig
Morgen jarig
Meest bekeken video's
Arcane: League of Legends - Season 2 (2024) |
Re:Monster (2024) |
Mysteries of the Terracotta Warriors (2024) |
Longlegs (2024) |
Karaoke (2022) |
Kimecu no jaiba - Hashira Geiko Hen (2024) |
Meest bezochte galerie
Une affaire d'honneur (2023) |
Star Wars: The Acolyte - Destiny (2024) |
Hit Man (2023) |
Sous la Seine (2024) |
Star Wars: The Acolyte - Episode 4 (2024) |
Bad Boys: Ride or Die (2024) |
I'm more than pleasantly surprised. I liked the fact that the film teetered on the edge of serious and quite deliberately crazy until the end, that its director was able to create a decently dense atmosphere and that he wasn't afraid of the ecological subtext, which was given a wonderful twist in the unexpected – but…
(meer)